DCT Gdańsk is the largest container terminal in the Baltic Sea region in terms of transhipments. The T2 investment task consisted the construction of the second quay. It is a deep water quay ca. 656 meters long and up to 17 meters deep. The general contractor was the BESIX Group, and the main subcontractor was Sopocka Spółka NDI.
Minerals DC Nowak delivered nearly 250k tons of marine aggregates for 19-month long project implementation, mainly subbase 0 / 31.5mm, sand 0 / 2mm and fractions for the production of concrete mixtures.